Management Site Visit at New Plastic Recycling Factory in KendalManagement Site Visit at New Plastic Recycling Factory in KendalManagement Site Visit at New Plastic Recycling Factory in KendalManagement Site Visit at New Plastic Recycling Factory in Kendal
  • Home
  • About us
  • Our people
  • Our work
  • Latest News
  • Careers
  • Contact us
  • English
    • English
    • Bahasa Indonesia
✕
Completion of RRP Building Phase-2 Karawang Plant PT HM Sampoerna Tbk.
August 25, 2023
Decorient Shines at Cargill’s Zero Harm Week
November 8, 2023
Management Site Visit at New Plastic Recycling Factory in Kendal
September 25, 2023
Categories
  • News
Tags
  • BIM
  • Building
  • Construction
  • Decorient
  • Digital Construction
  • Sustainability

Kendal, Sep 13th 2023

Our project team of ALBA Tridi Plastics Recycling Plant hosted the first management site visit since contract award at the project site in Kendal, Central Java. Vincent Cheng – CTO of Alba Tridi Plastics Recycling Indonesia, Viza Ramadhani – Technical Director of PT. Meinhardt Indonesia, David Schweinzer – Starlinger, and Antoine De Winter – Operation Director of PT. Decorient Partaya Indonesia joined the site visit.

During the site visit, Decorient presented the progress on site which is currently on schedule. Moreover, Decorient also produced a 3D model projection which visualized forecast progress for the next 3 months. The project will fully utilize BIM in the engineering process. As Main Contractor, Decorient’s scope of works includes Structural, Architectural, MEP and External works.

The new plastic recycling facility of which the construction is scheduled to be completed in Q3 2024, will house state-of-the-art equipment capable of processing PET beverage bottles and transforming them into high-quality rPET flakes and food-grade rPET pellets. The advanced technology comes from leading equipment manufacturers in Asia and Europe and can produce approximately 36,000 tons of recycled PET annually, including food-grade recycled PET.

To fulfill its production capacity of 36,000 tons, the factory will require approximately 48,000 tons of waste PET bottles each year. These bottles will primarily be collected in Java and the region, and ALBA will actively work with, and support local collectors providing this feedstock. The project will also generate new employment opportunities within the region in various technical and administrative roles recruited from within the local area.

Related posts

President Director of PT Decorient Partaya Indonesia

April 24, 2025

Topping Off Summarecon Mall Bekasi 2: Advancing Towards an Innovative Mall with the First Rooftop Wellness Facility in Bekasi


Read more

First Piling Ceremony

February 19, 2025

First Pile Driving marks the commencement of Santa Ursula School Penajam project


Read more

ALBA Tridi Factory Aerial View

September 27, 2024

The ALBA Tridi Project celebrated reaching one million safe man-hours without a lost time incident (LTI)


Read more
Management Site Visit at New Plastic Recycling Factory in Kendal

PT Decorient Partaya Indonesia
Menara Jamsostek, North Tower, 20th Floor
Jl. Jend Gatot Subroto No. 38, Jakarta 12710. Indonesia.


info@decorient.com

© 2021. PT DECORIENT PARTAYA INDONESIA
  • No translations available for this page